Question 1

Explanation

Switch stacking technology allows the network engineer to make that stack of physical switches act like one switch. The stacking cables together make a ring between the switches. That is, the switches connect in series, with the last switch connecting again to the first.

switch_stacking.jpg

Answer B is not correct as switch stacking is about connecting switches together so that they act as one switch, not about adding and removing hosts.

Answer C is not correct because switch stacking has nothing to do with performance of high-needs applications.

Surely switch stacking provides redundancy as stacking creates a ring of connection with two opposite paths. Whenever a frame is ready for transmission onto the path, a calculation is made to see which path has the most available bandwidth. The entire frame is then copied onto this half of the path.

With switch stacking, STP, CDP and VTP would run on one switch, not multiple switches. Also there would be one MAC address table, and it would reference all ports on all physical switches so we may say switch stacking has better resource usage. Also if we consider all stacking switches as one logical switch then surely the port density is increase very much. Therefore answer D is the most suitable one.

Reference: http://www.cisco.com/c/en/us/products/collateral/switches/catalyst-3750-series-switches/prod_white_paper09186a00801b096a.html

Question 2

Explanation

Chassis aggregation is a Cisco technology to make multiple switches operate as a single switch. It is similar to stacking but meant for powerful switches (like the 6500 and 6800 series switches). Chassis aggregation is often used in the core layer and distribution layer (while switching stacking is used for access layer).

The books do not mention about the benefits of chassis aggregation but they are the same as switch stacking.

+ The stack would have a single management IP address.
+ The engineer would connect with Telnet or SSH to one switch (with that one management IP address), not multiple switches.
+ One configuration file would include all interfaces in all physical switches.
+ STP, CDP, VTP would run on one switch, not multiple switches.
+ The switch ports would appear as if all are on the same switch.
+ There would be one MAC address table, and it would reference all ports on all physical switches.

Reference: CCNA Routing and Switching ICND2 200-105 Official Cert Guide

VSS is a chassis aggregation technology but it is dedicated for Cisco Catalyst 6500 Series Switches. VSS increases operational efficiency by simplifying the network, reducing switch management overhead by at least 50 percent -> A is correct

Single point of management, IP address, and routing instance for the Cisco Catalyst 6500 virtual switch
+ Single configuration file and node to manage. Removes the need to configure redundant switches twice with identical policies.
+ Only one gateway IP address is required per VLAN, instead of the three IP addresses per VLAN used today -> C is correct while D is not correct.
+ Removes the need for Hot Standby Router Protocol (HSRP), Virtual Router Redundancy Protocol (VRRP), and Gateway Load Balancing Protocol (GLBP)-> so maybe E is not correct.

Reference: http://www.cisco.com/c/en/us/products/collateral/switches/catalyst-6500-virtual-switching-system-1440/prod_qas0900aecd806ed74b.html

Question 3

Explanation

1:N master redundancy: Every switch in the stack can act as the master. If the current master fails, another master is elected from the stack.

1:N master redundancy allows each stack member to serve as a master, providing the highest reliability for forwarding. Each switch in the stack can serve as a master, creating a 1:N availability scheme for network control. In the unlikely event of a single unit failure, all other units continue to forward traffic and maintain operation.

Reference: http://www.cisco.com/c/en/us/products/collateral/switches/catalyst-3750-series-switches/prod_white_paper09186a00801b096a.html

Note:

N+1 simply means that there is a power backup in place should any single system component fail. The ā€˜Nā€™ in this equation stands for the number of components necessary to run your system. The ā€˜+1ā€™ means there is one independent backup should a component of that system fail. An example of “N+1” is your family has 5 members, so you need 5 cups to drink. But you have one extra cup for redundancy (6 cups in total) so that if any cup breaks, you still have enough cups for the family.

Comments (28) Comments
  1. Himanshu..
    June 5th, 2017

    Thank you 9tut :)

  2. Son
    June 13th, 2017

    Passed with the 747q dumps, all questions were from there.

  3. Miki
    June 16th, 2017

    @son can u pls send me the 747 dumps ?
    i have my exam in 4 days

    asik8888 @ gmail .com

  4. hi
    June 19th, 2017

    @MIki..
    can you please post recent dumps

  5. Fani
    June 20th, 2017

    @son plz shere recent dumps with us

  6. Jan
    July 10th, 2017

    please send me the latest dumps to ghulamrasoul(@)outlook.com

  7. db
    July 13th, 2017

    Hi Son, anyone,

    Can you please send 747q dumps on dblagojevic988 @ gmail. com

  8. Anonymous
    July 14th, 2017

    if anybody find plzzz send it tome tooooo {email not allowed}

  9. Anonymous
    July 15th, 2017

    anyone pls send dumps here pega.arnel @ yahoo. com

  10. nato
    July 23rd, 2017

    Can u please send me the 747q dumps?
    i have my exam {email not allowed}
    thanks in advance

  11. nato
    July 23rd, 2017

    nato_jimro @ outlook. com please send me the 747q

  12. kurimanasosa
    July 31st, 2017

    Can you please send me the 747q dumps?
    I’ll be having my exam soon
    Thanks!
    {email not allowed}

  13. Anonymous
    August 11th, 2017

    if we connect last to first switch does it create a loop

  14. CCNA X Help
    August 22nd, 2017

    I could use some help. could some1 please send the dumbs to michaelmckeever10@ Yahoo

    SON what version of the test are you taking icnd’s or X?

  15. Rizwanullah
    August 23rd, 2017

    can anyone send me 747q because I have an exam on 27 August 2017 if anyone could help please send it on pro6151945 at gmail dot com

  16. Mohammad
    August 24th, 2017

    Please any send me latest dumps. I have exam on next week. Email: {email not allowed}

  17. Mohammad
    August 24th, 2017

    Please any send me latest dumps. I have an exam on next week, sent it on mohammadnh93 at gmail dot com

  18. priyanka
    August 29th, 2017

    hello all,
    Can someone of you please send me the latest dumps?

  19. priyanka
    August 29th, 2017

    Please send me the latest dumps on {email not allowed}

  20. nandu
    September 5th, 2017

    master redundancy is 1:N or N+1 ?

  21. 2072
    September 6th, 2017

    can someone please send me the latest dumps? Thank you… email: {email not allowed}

  22. kari
    September 10th, 2017

    Hi

    Can sum1 plz send the latest dumps to karish.ccna***@***gmail.com

    remove ***

  23. Julian
    September 27th, 2017

    IT-Libraries dumps with 742 questions are valid. You can download the dumps from h*t*t*p*s*:*/*/*w*w*w*.*i*t*l*i*b*r*a*r*i*e*s*.*c*o*m*/*d*o*w**n*l*o*a*d*s*/*2*0*0*-*1*2*5*-*2*/ (remove *)

  24. Andile
    October 9th, 2017

    Can anyone please send me the latest update of 200-125 on {email not allowed}

  25. Suriya
    October 15th, 2017

    Can anyone please send me the latest dumps on sn cool prince 619 @ g mail .com (without spaces) . Thnx in adv.

  26. Jay
    October 28th, 2017

    Can anyone send me the latest dumps. {email not allowed}

  27. Dennis
    November 8th, 2017

    I took the test yesterday question 3 was there

  28. Malcolm
    November 21st, 2017
Add a Comment